Nuclear Waste Dry Cask Storage Calculator

Estimates how many dry storage casks are needed for a number of spent fuel assemblies, given how many assemblies each cask holds.

Last updated: October 2026

Dry Casks Needed

38 casks

Formula below · 2 sources (nrc.gov, dps.ny.gov) · Updated Oct 2026

Compare with similar

About this calculator

Spent fuel from US reactors is first cooled in a pool and then often moved to dry casks: sealed steel canisters inside concrete or steel overpacks, stored on a pad at the plant. Each cask design is licensed by the NRC for a set number of fuel assemblies, so the number of casks is a division rounded up:

Casks = ⌈assemblies ÷ assemblies per cask⌉

Typical capacities

Pressurized-water reactor (PWR) assemblies are larger than boiling-water reactor (BWR) assemblies, so a cask holds fewer of them. Licensed designs include 24 PWR assemblies (NUHOMS-24P), 32 PWR assemblies (TN-32 and the HI-STORM 100 MPC-32), 52 BWR assemblies (NUHOMS 52B) and 68 BWR assemblies (HI-STORM 100 MPC-68). See the table below.

What this does not include

A real loading plan also depends on each assembly's burnup, enrichment and cooling time, which set the heat load a cask may hold; some assemblies may need a lower-capacity basket. Use the result as a first count, not a licensing calculation.

Capacities of some NRC-licensed dry storage designs

Scroll sideways to see all columns →

DesignReactor typeAssemblies per cask
NUHOMS-24PPWR24
TN-32PWR32
HI-STORM 100, MPC-32PWR32
NUHOMS 52BBWR52
HI-STORM 100, MPC-68BWR68
Source: U.S. NRC — dry cask storage system documents

How to use

Enter the number of spent fuel assemblies and the capacity of the cask design. With the defaults (1,200 PWR assemblies in 32-assembly casks): 1,200 ÷ 32 = 37.5, rounded up to 38 casks. Second example: 3,000 BWR assemblies in 68-assembly canisters need 3,000 ÷ 68 = 44.1, rounded up to 45 casks.

Frequently asked questions

How many fuel assemblies fit in one dry cask?

It depends on the licensed design and the reactor type. Common PWR designs hold 24 or 32 assemblies; BWR designs hold 52 or 68, because BWR assemblies are smaller.

Why round up?

A partly filled cask is still a cask on the pad. The last cask in the example holds only 16 of its 32 places.

Can every assembly go into any cask?

No. Each design's license limits the heat output, burnup, enrichment and cooling time of the fuel it may hold. Hotter or higher-burnup assemblies can need more cooling time in the pool or a different basket.